The aim of this project is to execute a 24" Gas Pipeline with approximate length of 24 Km from Al Rayyan Gas Station (15 Km to the east of HOMS city) to the entrance of Jandar Power Plant Expansion in addition to execute all Piping, Cathodic Protection, Lighting, Fencing & related civil activities that required for both Launching site at Al Rayyan & Receiving Site at Jandar, in order to export the required gas for exceeding Jandar power plant capacity to 400 Megawatt.
Within a critical period with the absence of all kinds of security, ASAS Syria had taken an advantage step to execute this project despite of all the existed bad circumstances that faced it at that time & accomplished on its scheduled time.