Al Shaer Gas Gathering Station Rehabilitation

Description:

The aim of this project is to make engineering, construction & procurement for all required materials & equipment to rehabilitate Al Shaer GGS & to shipped the dried produced Gas from Al Shaer GGS to EBLA Gas Treatment Plant by the existing 16" Trunk Line.

This project is to rehabilitate all the existing Gas piping, All Units, Flowlines & Trunk Line, in order to ensure safe operation with total capacity of the station.

Within a critical period with the absence of all kinds of security, ASAS Syria had taken an advantage step to execute this project despite of all the existed bad circumstances that faced it at that time & accomplished on its scheduled time.

Clients:

Ebla Petroleum Company (ebco) with Corporation PETRO - CANADA.

Project Scope:

  • Basic Engineering & Detailed Design.
  • Procurement.
  • Construction (including: Survey, Site Preparation, Earthworks, Fabrication, Welding, NDT, Grit blast & Painting, Backfilling, Hydrotest,...etc) for the following:


    • Five 8" Flowlines. - Inlet Manifold.
    • Fuel Gas System.
    • T.E.G System.
    • Flare Knock out Drum.
    • Closed Drain System.
    • Production & Test Separators.
    • Earthing & Lighting System.
    • Instrumentation Air Compressors System.
    • Fire Fighting System. - Diesel Generators System.
    • Fire & Gas Detection System.
    • SCADA System.
    • Communication System.


  • Time Schedule and Progress Reporting.
  • Documentation & Submittals.
  • Deliverables Plan including General Deliverables for Mechanical & Piping Works, Civil & Structural Works, Electrical & Instrumentation Works.
  • Key personnel.
  • Quality Management System.
  • Inspecting & Testing.
  • Quality Records.
  • Testing, Pre Commissioning, Commissioning & Start-up.