Al Maher Gas Collection Station Rehabilitation

Description:

The aim of this project is to make engineering, construction & procurement for all required materials & equipment to rehabilitate Al Maher GCS & to shipped the produced Gas from Al Maher-Wells to Hayyan Gas Treatment Plant by the existing export pipeline, this project is divided to two parts:

  • First Part: (E.P.C) to rehabilitate all the existing Gas piping, All Units & Export Pipeline, in addition to execute living quarters, MCC & Control Room in order to ensure safe operation with capacity of no less than 600 thousand cubic meters per day.
  • Second Part: Construct 4.5 Km graded road that lead to Al Maher GCS from HAMA Tarmac road.

Client:

HAYAN Petroleum Company (HPC) with Corporation INA.

Project Scope:

  1. Basic Engineering & Detailed Design.
  2. Procurement.
  3. Construction (including: Survey, Site Preparation, Earthworks, Fabrication, Welding, NDT, Grit blast & Painting, Backfilling, Hydrotest,...etc) for the following:
    • Inlet Manifold.
    • Heater - Exchanger.
    • Fuel Gas System.
    • T.E.G   System.
    • Flare System.
    • Closed Drain System.
    • Production & Test Separators.
    • Earthing & Lighting System.
    • Instrumentation Air Compressors System.
    • Fire Fighting System.
    • Diesel Generators System.
    • Fire & Gas Detection System.
    • P.L.C  System.
    • Communication System.
    • Living Quarters.
    • M.C.C.
    • Control Room.
    • Parking & Sunshades.
    • New 2500 Square Meter Yard.
    • 4.5 Km Graded Road.
  4. Time Schedule and Progress Reporting
  5. Documentation & Submittals.
  6. Deliverables Plan including General Deliverables for Mechanical & Piping Works, Civil & Structural Works, Electrical & Instrumentation Works.
  7. Key personnel.
  8. Quality Management System.
  9. Inspecting & Testing.
  10. Quality Records.
  11. Testing, Pre Commissioning, Commissioning & Start-up.



Al-Maher-Gas-Collection-Station-Rehabilitation-01
Al-Maher-Gas-Collection-Station-Rehabilitation-02
Al-Maher-Gas-Collection-Station-Rehabilitation-03
Al-Maher-Gas-Collection-Station-Rehabilitation-04
Al-Maher-Gas-Collection-Station-Rehabilitation-05
Al-Maher-Gas-Collection-Station-Rehabilitation-06